Project
Project : Independent Engineering Services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4-lane Hyderabad-Vijayawada Section from Km. 40.000 to Km. 221.500 of NH-9 (old) / 65 (New) in the state of Andhra Pradesh under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Basis
Client : National Highways Authority of India
Funded by : Domestic Funding
Sector : Highways
Start Date : 01/05/2010
End Date : 01/11/2014
Total Project Length is 181 .500 km (4 / 6 lane)
The project involves Independent Engineering Services for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of 4-lane Hyderabad-Vijayawada Section from Km. 40.000 to Km. 221.500 under DBFOT.
The project envisages construction of Major Bridges - 3 nos.; Minor Bridges – 44 nos.; VUPs – 15 nos.; PUPs – 20 nos; CUPs- 10 nos.; Slab/Box Culverts – 133 nos; Pipe Culverts –234 nos; Toll Plazas – 3 nos; and 6 nos. of Bypasses of total length of about 24.659 km