Project
Project : Independent Consultancy Services for 4 / 6 laning of Zirakpur – Parwanoo Section of NH-22 including Pinjore - Kalka - Parwanoo Bypass on BOT basis under NHDP - Phase IIIA in the States of Punjab, Haryana and HP
Client : National Highways Authority of India
Funded by : Domestic Funding
Sector : Highways
Start Date : 01/04/2008
End Date : 01/03/2012
Total Project Length: 28.4 km
The project package provides for developing the existing two lane carriageway to four lane dual carriageway configuration between km.39.960 and km.57.400 and construction of new 4 lane Pinjore-Kalka-Parwanoo bypass from km. 57.400 to km. 67.500, comprising 7 km of hilly areas.
The project envisages construction of the Major Bridges / Structures - 11 nos., Minor Bridges - 3 nos.; Box Culverts - 38 nos.; Pipe Culverts – 15 nos; VUPs – 7 nos; PUPs- 3 nos. The road construction includes RE walls (for approaches), RR masonry walls, Retaining walls and other slope protection structures / measures in hilly area.